Monthly Archives: November 2017

November 2017

The Choctaw Lake project is finished! There was a total of 40,000 cubic yards of material removed from the lake using our VMI dredge with an 8” pump. The material was pumped up to 3,000 feet away to an open disposal basin that Heartland Dredging constructed. The dredge performed exceptionally well, and the residents are […]

Posted in Uncategorized | Comments Off on November 2017