Monthly Archives: September 2016

September 2016

Heartland Dredging’s big dredge has been working away on the Bloomington, Illinois CSO lagoon project. The lagoon is used to control storm water overflow during heavy rainfall. While on the Bloomington job, Heartland was able to install a GPS guidance system on the dredge that provides the operator with the machine‚Äôs location, heading, speed and […]

Posted in Uncategorized | Comments Off on September 2016